Abstract:
The multi-annual work programme for the SJU covered the period 2016-2019, with a further outlook to 2021. It outlines the context, objectives, budget and high-level description of the SESAR 2020 Resea ...
Abstract:
This document constitutes the Operational Demonstrations of RPAS in European Airspace (ODREA) project Demonstration Report. It provides an overview of the project, and describes in details how the dem ...
Abstract:
Interoperability is the key for SWIM. Interoperability Frameworks are created to structure and to classify the different interoperability aspects from different perspectives (IT systems, data/informat ...
Abstract:
The Information Service Reference model (ISRM) is a model built collaboratively by the SESAR SWIM community. It provides each service with a complete description in terms of functionality, behaviour ...
Abstract:
The brochure presents Electronic Visibility via ADS‐B (EVA), a SESAR project which aims at evaluating in live conditions the feasibility and benefits of automatic dependent surveillance – broadcast (A ...
Abstract:
The brochure presents TOPLINK, a SESAR project which aims to demonstrate the benefits of the deployment of System Wide Information Management (SWIM)-based services, including MET, aeronautical, corpor ...
Abstract:
The Annual Activity Report 2014 is published for information purposes only. The formal approval thereof is yet subject to the final endorsement and signature of the Decision of the SESAR Joint Underta ...
Abstract:
The project demonstrated new Navigation Specifications included in the Performance Based Navigation (PBN) manual for rotorcraft, general, business and regional fixed-wing operators. Eight different sc ...
Abstract:
The objective of the DFLEX project was to demonstrate enhanced flexibility to the Pre-Departure Sequencing process currently in operation at Charles De Gaulle Airport, by allowing flight reordering ba ...
Abstract:
The objective of the FAIR STREAM project was to pave the way for the use of target time of arrival (TTA) instead of - or complementary to - calculated take-off time (CTOT). ATC workload, the flight ef ...
Abstract:
Validation Report for AIRE 3 ENGAGE Phase II project. - This document describes the context, project management, demonstration and communication activities that will be undertaken to deliver and share ...
Abstract:
Validation Report for AIRE 3 WE-FREE project. - This document describes the Final report of the WE FREE project that involves DSNA Skyguide, ENAV as ANSP and Air France, Alitalia and HOP! as Airspace ...
Abstract:
Validation Report for AIRE 3 OPTA-IN project. - The OPTA-IN project focuses on the development and demonstration of fuel efficient TMA procedures taking full advantage of aircraft RNP capabilities wit ...
Abstract:
Validation Report for AIRE 3 REACT PLUS project. - This document provides the Demonstration Report for REACT-Plus project and describes how the project demonstrations have been conducted and the resul ...
Abstract:
Validation Report for AIRE 3 SATISFIED project. - Demonstration Report for the CANARIAS Project, highlighting the purpose and execution of the demonstrations exercises, assessment and methodology of c ...
Abstract:
Validation Report for AIRE 3 AMBER project. - This document provides the Demonstration Report for the AMBER Project, describes how the project demonstrations have been conducted, and provides the resu ...
Abstract:
Validation Report for AIRE 3 CANARIAS project - Demonstration Report for the CANARIAS Project, highlighting the purpose and execution of the demonstrations exercises, assessment and methodology of col ...